← Back to Projects

PER Power Electronics Design Challenge

A Penn Electric Racing recruiting circuit, not a part on the car.

Fall 2026

  • Power Electronics
  • Circuit Design
  • Comparators
  • Buck Converters
  • EMI
  • CircuitLab

Key outcomes

  • Comparator path converts brake/current analog signals into digital threshold decisions before logic gating
  • Timing analysis centered on the 0.5 s response constraint and caught an early requirement misread
  • Buck selection compared LM5164 vs LMR33630 around current headroom, ripple, EMI behavior, and package/thermal tradeoffs
PER Power Electronics Design Challenge, photo 1

Project overview

PER Power Electronics Design Challenge, photo 2

Independent engineering work for Penn Electric Racing's recruitment process. The circuit watches brake and current sensor conditions, decides when those conditions are satisfied together, and activates an indicator within a required response window. Power comes from an automotive-style 12 V domain that must be regulated for the sensing and logic stages.

System architecture

PER Power Electronics Design Challenge, photo 3

12 V supply → regulation → sensor/reference network → comparators → logic → timing → indicator.

Power regulation
Steps the vehicle supply into a clean enough low-voltage rail for references, comparators, and logic.
Sensor inputs
Bring brake and current sensing into the threshold stage with usable reference levels.
Threshold detection
Comparators answer whether each sensor has crossed its required level.
Logic + timing
Combine conditions and shape the response so the indicator meets the timing requirement.

Engineering decisions

DecisionAlternativeWhy
Treat the buck as a system, not a voltage labelPick the first 5 V regulator that fits the pinoutScore candidates on system metrics first.
Response time is a max, not a delay aestheticTreat 0.5 s as a minimum delayRe-check simulation against the requirement text, then revise the timing interpretation.

Implementation

PER Power Electronics Design Challenge, photo 4

I first read 0.5 s as a minimum delay. The requirement is a maximum response time. There is no pass or fail number on this page for that timing.

Results and future work

Transient simulation captured. CircuitLab transient analysis is on the page as primary verification evidence for response behavior. Measured response time. I have not written down a measured response time from the simulation readout. Requirement check. I have not marked the revised timing pass or fail against the written window.

Still open. Datasheet comparison cells are filled from my Task C write-up; re-check against the latest datasheet revision when needed.

  • Bring the same datasheet-driven buck review into other automotive / drivetrain boards.
  • Practice writing verification tables before schematic polish.
Full engineering log

Motivation

Why I started this

What pulled me in, and what I wanted to get better at.

Why I built it

Penn Electric Racing's recruiting problem asked for a circuit that watches two sensors, decides when both conditions are true, and lights an indicator inside a written time window. The supply is an automotive-style 12 V rail.

What interested me

The interesting part was not drawing a schematic. It was deciding how threshold detection, logic, timing, and a 5 V rail from a noisy ~12 V vehicle supply should fit together without inventing convenience that the environment will punish.

What I wanted to learn

I wanted a harder look at buck-converter selection: efficiency, headroom, ripple, EMI, and board area as a system, not as a single 'outputs 5 V' checkbox.

System Overview

How the system fits together

Independent engineering work for Penn Electric Racing's recruitment process. The circuit watches brake and current sensor conditions, decides when those conditions are satisfied together, and activates an indicator within a required response window. Power comes from an automotive-style 12 V domain that must be regulated for the sensing and logic stages.

01

Power regulation

Steps the vehicle supply into a clean enough low-voltage rail for references, comparators, and logic.

02

Sensor inputs

Bring brake and current sensing into the threshold stage with usable reference levels.

03

Threshold detection

Comparators answer whether each sensor has crossed its required level.

04

Logic + timing

Combine conditions and shape the response so the indicator meets the timing requirement.

05

Indicator

Make the decision visible without loading the decision node incorrectly.

Data flow

12 V supply → regulation → sensor/reference network → comparators → logic → timing → indicator.

Control flow

Analog thresholds become digital decisions; the timing network enforces response behavior before the LED stage.

Design Challenge Deep Dive

Independent engineering work completed as part of Penn Electric Racing's recruitment process. Not hardware designed for or used on the PER car.

Signal / power path

0112 V Supply
02Power Regulation
03Sensor Inputs
04Threshold Detection
05Logic
06Timing / Response
07Indicator

Why each block exists

Each stage answers one question. If a block cannot justify itself, it should not be on the board.

Comparator 1

Has the brake signal crossed its required threshold?

Turns an analog brake condition into a clear decision edge for the logic stage.

Comparator 2

Has the current signal crossed its required threshold?

Same idea for current sensing so both conditions share a comparable decision language.

Logic

Are the required conditions simultaneously true?

Prevents an indicator trip on a single sensor event when concurrency is required.

Timing

Does the circuit satisfy the required response behavior?

Shapes how quickly the decision becomes a visible indicator event.

Power regulation

Is the low-voltage rail honest under automotive supply and load?

Keeps references and logic alive without dumping switching pain into the sensing path.

Indicator

Can a human see the decision without loading the circuit badly?

Closes the loop from requirement to observable behavior.

Process notes

Task A prep notes
Handwritten prep notes for the monitoring circuit

Paper planning before the CircuitLab schematic.

Task B prep notes
Handwritten buck converter research notes

Divider vs linear vs buck, ON/OFF paths, and duty-cycle knobs.

Schematic

CircuitLab schematic
CircuitLab schematic for the sensor-monitoring indicator circuit

12 V → 7805 rail, brake/current comparator windows, logic aggregation, RC timing, latch, and LED indicator.

Datasheet comparison

LM5164 vs LMR33630

These cells are blank on purpose. I have not copied a number from the datasheet into this table.

Efficiency

Less energy wasted as heat in a packed enclosure.

LM5164

High (no matched 12–17→5 V / 0.5 A curve in sheet)

LMR33630

5 V curves published; >95% peak claimed

MOSFET R_DS(on)

Lower switch resistance reduces conduction loss as load current rises (P = I²R).

LM5164

HS 725 mΩ · LS 330 mΩ

LMR33630

HS 75 mΩ · LS 50 mΩ (VQFN)

Output-current capability / headroom

Provides margin when MCU, sensors, or CAN circuitry create transient loads.

LM5164

1 A class part (challenge shortlist)

LMR33630

3 A class part (challenge shortlist)

Transient response

Determines how well the 5 V rail stays regulated when load current suddenly changes.

LM5164

External L/C dominated

LMR33630

External L/C dominated

Output-voltage ripple

Excessive supply noise can affect sensitive analog measurements.

LM5164

Passives + f_s set the result

LMR33630

Higher f_s options help smaller passives

EMI behavior

Fast switching edges can inject noise into nearby sensor and communication circuitry.

LM5164

CISPR 25 Class 5 documented

LMR33630

Low EMI / HotRod package claimed

Switching frequency

Higher frequency can shrink L and C; it also raises switching loss and EMI risk.

LM5164

Adjustable up to 1 MHz

LMR33630

Fixed options: 400 kHz / 1.4 MHz / 2.1 MHz

PCB footprint

Matters in tightly packaged automotive electronics.

LM5164

SO PowerPAD ~4.9 × 6 mm

LMR33630

VQFN ~3 × 2 mm

Unit cost (approx.)

BOM pressure on a multi-board vehicle program.

LM5164

~$4.50

LMR33630

~$3 (Detkin stock caveat for LM)

Thermal behavior

Heat that has nowhere to go becomes a reliability and layout problem.

LM5164

Package + conduction loss story

LMR33630

Lower R_DS(on) helps conduction heat

Task B · buck research
One-page buck converter research write-up

Duty cycle, ON/OFF energy path, and switching-frequency tradeoffs.

Task C · IC selection
IC selection comparison page for LM5164 vs LMR33630

Use-case-weighted comparison; recommended LMR33630 for this board.

Task C · decision
IC selection conclusion page

Final pick with EMI counterargument kept explicit.

Understanding EMI

~ ~ ~

Radiated EMI

Buck converter
↓
Nearby analog / CAN
↓
5 V rail → sensor / MCU

Conducted noise on the supply path

Conducted noise

Switching disturbances travel through PCB traces, supply rails, or ground and show up as rail bounce or reference noise.

Radiated noise

Fast-changing currents and voltages create electromagnetic fields that can couple into nearby circuitry without a shared conductor.

On a sensor / data-acquisition board near electrically noisy drivetrain hardware, both paths matter. A quiet schematic can still become a noisy measurement if the buck stage is treated as isolated from the analog neighborhood.

Verification

Verification is where the design meets the written requirement. Waveform first; numbers only when measured.

CircuitLab transient
CircuitLab transient analysis for response timing

Primary simulation evidence from the challenge submission.

Indicator responds within the allowed response window

Mechanism: Comparator + logic + timing network

Method: CircuitLab transient analysis

Not recorded

Both sensor conditions required before indication

Mechanism: Concurrent logic on comparator outputs

Method: Functional simulation / schematic review

Not recorded

5 V rail suitable for sensing/logic under automotive input

Mechanism: Buck regulation stage

Method: Datasheet comparison. No rail simulation is recorded.

Not recorded

What changed after checking the requirement

Engineering was iterative. The circuit could function and still be wrong relative to the written response-time requirement.

  1. 1

    Initial interpretation

    Treated 0.5 s more like a minimum delay aesthetic than a maximum allowable response.

  2. 2

    Simulation

    Captured transient behavior for the indicator path.

  3. 3

    Compare against the written requirement

    Re-read the response-time wording as a bound the design must stay inside.

  4. 4

    Identify the mismatch

    A 'working' delay story can still fail a maximum-response requirement.

  5. 5

    Revise understanding / design

    Updated the timing interpretation so verification targets the real constraint.

Engineering Breakdown

Broken down by discipline

Each block is the requirement, how that part works, what I checked, and what is still open.

01Sensing & Decision Logic

Sensing & Decision Logic

Goal

Detect when brake and current conditions are simultaneously satisfied and drive an indicator.

Design

Comparator stages for each threshold, logic that requires the concurrent condition, and a timing network that sets response behavior.

Challenges

  • Reference and hysteresis choices change how noisy sensor edges look at the comparator.
  • Response timing is a requirement, not a cosmetic RC preference.

Iterations

  • First-pass threshold network.
  • Logic combination of both conditions.
  • Timing revised after checking the written response requirement.

Final implementation

Comparator + logic + timing path aimed at concurrent detection and bounded indicator response.

02Power Regulation

Power Regulation

Goal

Generate a usable 5 V rail from an automotive ~12–17 V domain without treating the converter as a black box.

Design

Compared candidate buck architectures (LM5164 vs LMR33630 class parts) against efficiency, current headroom, transient behavior, ripple, EMI, footprint, and thermal story.

Challenges

  • A part that 'makes 5 V' can still fail the rest of the board through noise or weak transient response.
  • EMI couples into sensor and communication circuitry that lives next to the power stage.

Iterations

  • List of metrics that matter for this PCB.
  • Side-by-side datasheet reading (values still being filled in on the page).
  • EMI framing for conducted vs radiated noise.

Final implementation

Documented selection criteria and comparison scaffold for the buck stage.

Key Design Decisions

Design decisions

DecisionAlternativeWhy
Treat the buck as a system, not a voltage labelPick the first 5 V regulator that fits the pinoutScore candidates on system metrics first. I have not copied exact datasheet numbers into this page.
Response time is a max, not a delay aestheticTreat 0.5 s as a minimum delayRe-check simulation against the requirement text, then revise the timing interpretation.
Notes on these decisions

Treat the buck as a system, not a voltage label

Generating 5 V from ~12–17 V looks simple until load steps, ripple, EMI, and packaging show up.

A tiny or cheap part can still heat the board, ring the rail, or couple noise into analog paths.

Score candidates on system metrics first. I have not copied exact datasheet numbers into this page.

Response time is a max, not a delay aesthetic

An RC timing network can satisfy 'the circuit waits' while still violating a maximum allowable response.

Misreading the written requirement produces a working waveform that fails the spec.

Re-check simulation against the requirement text, then revise the timing interpretation.

Results & Validation

What held up

What worked in the end, what I can show for it, and where it's still limited.

Transient simulation captured

Transient waveform

CircuitLab transient analysis is on the page as primary verification evidence for response behavior.

Transient analysis
CircuitLab transient analysis waveform for the PER sensor-monitor circuit

CircuitLab transient analysis from the submission package. Read timing from the plot; do not invent numbers here.

Measured response time

No measured time recorded

I have not written down a measured response time from the simulation readout.

Schematic
Final CircuitLab schematic

Requirement check

No pass or fail recorded

I have not marked the revised timing pass or fail against the written window.

Limitations

  • Datasheet comparison cells are filled from my Task C write-up; re-check against the latest datasheet revision when needed.
  • Pass/fail interpretation of response time is intentionally unmarked until the transient readout is confirmed.
  • Challenge-circuit rail used a 7805; the LMR33630 recommendation is for a sensor/DAQ PCB use case.
Bench notes

The longer design notes, the timeline, and the revisions. The sections above are the system and what I measured.

Evolution

How it got here

The steps I can put in order from the notes. A clip opens from its still.

  1. Prep notes for the monitoring circuit
    Prep notes for the monitoring circuit

    Draft

    Threshold path on the page

    Built the sensing → compare → logic → indicate story before locking the power stage.

  2. Transient analysis waveform
    Transient analysis waveform

    Simulate

    Transient check

    Ran CircuitLab transient analysis to see indicator timing against the intended behavior.

  3. Final CircuitLab schematic
    Final CircuitLab schematic

    Correct

    Requirement mismatch

    Caught that the response-time wording was a maximum, not a minimum delay, and revised understanding/design.

Reflection

Looking back

What surprised me, what I'd redo, and questions I'm still chewing on.

What surprised me

  • Power regulation stopped being 'does it output 5 V?' and became a system question about heat, ripple, EMI, and load steps.
  • A circuit can look correct in simulation while still failing a written timing requirement if the requirement is misread.

What I would redesign

  • Annotate the transient plot with cursor readouts for response time.
  • Keep the 7805 vs LMR33630 distinction explicit so the page never looks inconsistent.

Future improvements

  • Bring the same datasheet-driven buck review into other automotive / drivetrain boards.
  • Practice writing verification tables before schematic polish.

Questions that emerged

  • How much EMI margin is enough for sensor and CAN neighbors on a denser PCB?
  • Which transient cases should be mandatory before locking a buck choice?

Notes

  • Recruitment challenge only. This page is independent analysis, not PER vehicle hardware.
  • Requirement text is part of the design. Simulation without that check is incomplete.